s NOC | Power Transmission Corporation of Uttarakhand Limited(PTCUL)

NOC Obtaining Application



6
Total Application *
5
Total NOC given
0
Total Rejected
 

The Hon'ble Central Electricity Regulatory Commission had approved the Detailed Procedures of Central Transmission Utility under Regulation 27 (1) of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009.

The Clause 23 of "Procedure for making application for Grant of Long-term Access to ISTS" read with sub clause 23.3 requires that -

In case an intra-State entity is applying for LTA, concurrence of concerned State Transmission Utilities of states having injection and drawl points shall be obtained in advance in the prescribed format [FORMAT-LTA-3] and attached with the application.

In accordance with the same and to facilitate the applicants in seeking No Objection Certificate (NoC) from PTCUL (STU), this online system for issuance of NoC has been devised for timely and hassle free processing of request of issuance of NoC of the applicants.

Applicants are required to submit the requisite details as desired in the online system correctly so as to enable PTCUL (STU) to issue the required NoC in a timely manner.