TENDERS AND NOTICES 

Haldwani   

 

NIT NO

Document Sale

Tender Classifications

Description

Downloads

Opening Date Closing Date
Address :- E.E. (Elect/Civil)
CE(O&M)/30/2014-15 10/04/2015 09/04/2015 Substation

Development of switchyard including dismantling of chain link fencing and its re-erection for 2x50 MVA, 220/33 KV transformers at 220 KV S/S Pantnagar

CE(O&M)/31/2014-15 07/05/2015 06/05/2015 Pantnagar(O&M Division)

Annual maintenance of 220 KV & 132 KV transmission lines under 220 KV O&M Division, Pantnagar

SE(O&M)/32/2014-15 06/05/2015 05/05/2015 Pantnagar(O&M Division)

Supply of 110 V, 300 AH VRLA Battery set at 132 KV Substation Bhowali

SE(O&M)/33/2014-15 06/05/2015 05/05/2015 Pantnagar(O&M Division)

Supply of 132 KV CT at 132 KV S/S Haldwani

SE(O&M)/34/2014-15 06/05/2015 05/05/2015 Pantnagar(O&M Division)

Supply of Fire Extinguishers at 132 KV S/S Haldwani

SE(O&M)/03/2015-16 06/06/2015 01/06/2015 Substation

Revetment work for protection of ‘A’ type tower location No. 68 & 69 of 132 KV Bazpur-Haldwani line.

SE(O&M)/04/2015-16 06/06/2015 01/06/2015 Substation

Thermovision (Hot Spot ) scanning work of 220 KV Pantnagar-Haldwani line & 132 KV Bazpur-Haldwani line.

SE(O&M)/05/2015-16 06/06/2015 01/06/2015 Substation

Construction of fire wall at 132 KV S/S Haldwani

CE(O&M)/06/2015-16 19/06/2015 18/06/2015 Substation

Construction of store building for the safety of delicate and costly equipments at 220 KV S/s Mahuakheraganj.

CE(O&M)/07/2015-16 19/06/2015 18/06/2015 Substation

Replacement of old poor condition ACSR panther conductor of 132 KV Kashipur (400)–Kashipur Ckt.-I line from tower No.143 to 136 & JK-1.

SE(O&M)/09/2015-16 06/07/2015 06/07/2015 Substation

Hot Spot scanning of various 132 KV Lines under O&M Division, Almora.

SE(O&M)/10/2015-16 06/07/2015 06/07/2015 Substation

Work of grass cutting at Yard & store yard of 220 KV S/s Haldwani, 132 KV S/s Kathgodam & Bhowali

SE(O&M)/11/2015-16 06/07/2015 06/07/2015 Substation

Construction of store shed (all sides open) at 220 KV Substation Haldwani.

SE(O&M)/12/2015-16 17/07/2015 17/07/2015 Substation

Replacement of defective 2x2.5 mm2 control cables with armored cable at 220 KV S/s Haldwani.

SE(O&M)/13/2015-16 17/07/2015 17/07/2015 Substation

Supply of chemicals & putties for arresting oil leakage at 220 KV S/s Haldwani

SE(O&M)/14/2015-16 17/07/2015 17/07/2015 Substation

Land development for construction of 20 MVA transformer Bay at 132 KV S/s Bhowali

SE(O&M)/15/2015-16 27/08/2015 27/08/2015 Substation

Replacement of old 33 KV Circuit Breaker with new 33 KV Circuit Breaker at 220 KV S/s Haldwani.

SE(O&M)/16/2015-16 27/08/2015 27/08/2015 Substation

Clearance of patrolling path at 220 KV Pantnagar – Haldwani line & 132 KV Bazpur – Haldwani line.

SE(O&M)/17/2015-16 27/08/2015 27/08/2015 Substation

Supply of Armoured Control Cables for 220 KV S/s Haldwani.

CE(O&M)/18/2015-16 01/09/2015 25/08/2015 Civil

Construction of store and guest room at 132 KV S/s Bazpur.

CE(O&M)/19/2015-16 01/09/2015 25/08/2015 Civil

Building Protection wall on Tower location No. 33 & 34 of 132 KV Almora-Ranikhet Line.

CE(O&M)/20/2015-16 01/09/2015 25/08/2015 Civil

Annual maintenance of 400KV Kashipur –Dhampur D/C Line and 400 KV Dhampur – Moradabad S/C line.

CE(O&M)/21/2015-16 28/08/2015 28/08/2015 Substation

The miscellaneous works of cartage of 35000 liter transformer oil from 220 KV Substation Pantnagar to 132 KV substation Kichha including replacement of transformer oil in 40 MVA Tranformer-I & II at 132 KV substation,Kichha. (Short Term Notice)

SE(O&M)/24/2015-16 09/11/2015 09/11/2015 Substation

Annual preventive maintenance of 220 KV Bareilly-Pantnagar line under 220 KV O&M Divn., Pantnagar.

SE(O&M)/25/2015-16 09/11/2015 09/11/2015 Substation

Work of cutting of wild bushes & grass on yearly basis at 220 KV S/s Pantnagar.

SE(O&M)/26/2015-16 09/11/2015 09/11/2015 Substation

Supply & Installation of 1.3 MP Fixed Bullet Camera for control room, carrier room, switchyard & surrounding of control building and Divisional Office building at 220 KV S/s Pantnagar.

SE(O&M)/29/2015-16 29/12/2015 29/12/2015 Substation

General Civil maintenance & whitewashing of quarters of residential colony at 132 KV S/s Rudrapur.

SE(O&M)/30/2015-16 29/12/2015 29/12/2015 Substation

Painting of Marshalling box, junction box & miscellaneous equipments/accessories and replacement of damaged/broken rubber bidding Junction boxes of BMK, CT, CVT, operating boxes of isolator, earth switch & Circuit Breaker, Control and relay panel installed at 132 S/s Kichha.

SE(O&M)/31/2015-16 29/12/2015 29/12/2015 Substation

Mapping, upkeeping & monitoring work of 220 KV Bareilly – Pantnagar S/C line.

CE(O&M)/32/2015-16 05/01/2016 05/01/2016 Substation

INSTALLATION OF DUCTABLE TYPE AIR CONDITIONER IN CONTROL ROOM, CARRIER ROOM ETC AT 220 KV SUBSTATION PANTNAGAR.

SE(O&M)/33/2015-16 23/01/2016 23/01/2016 Substation

Turfing & gravelling work at 220 KV Substation yard & existing area Kamaluaganja

SE(O&M)/34/2015-16 23/01/2016 23/01/2016 Substation

Replacement of 1 No. old 33 KV BHEL make VCB (Pine feeder) with new 33 KV Circuit Breaker at 132 KV S/s Bhowali.

SE(O&M)/35/2015-16 23/01/2016 23/01/2016 Substation

Supply of 110 V, 300 AH VRLA Battery set at 132 KV Substation Almora.

CE(O&M)/36/2015-16 02/02/2016 02/02/2016 Substation

Construction of store shed, Plinth and chain link fencing at 400 KV S/s Kashipur.

SE(O&M)/37/2015-16 03/03/2016 27/02/2016 Substation

Supply of 132 KV L.A., 33 KV P.T. and 33 KV C.T. at 220 KV Substation Pantnagar.

SE(O&M)/38/2015-16 03/03/2016 27/02/2016 Substation

Supply of 33 KV Isolator at 132 KV S/s Kichha.

SE(O&M)/39/2015-16 03/03/2016 27/02/2016 Substation

Replacement of old Gaskets of 40 MVA, 132/33 KV T/f-I and 40 MVA, 132/33 KV T/f-II installed at switchyard of 132 KV S/s Kichha.

CE(O&M)/40/2015-16 29/03/2016 28/03/2016 Substation

Annual M&R Civil Works In Residential Colony at 400 KV Kashipur.

SE(O&M)/41/2015-16 29/03/2016 28/03/2016 Substation

Repairing of revetment wall of Tower No. 194 of 132 KV Almora Pithoragarh line.

SE(O&M)/42/2015-16 29/03/2016 28/03/2016 Substation

Dismantling of SP-72 Pole from Darimkhola Village to Tower No. 267 of 132 KV Almora – Pithoragarh line.

SE(O&M)/43/2015-16 29/03/2016 28/03/2016 Substation

Construction of 5 MVA Transformer Plinth at 132 KV Substation Bhowali.

71/2015-16 18/04/2016 08/04/2016 Substation

Providing One No. Diesel Running Car in good condition of latest model

72/2015-16 18/04/2016 08/04/2016 Substation

Providing One No. Diesel Running Jeep in good condition of latest model

SE(O&M)/44/2015-16 06/05/2016 05/05/2016 Substation

Centrifuging work of 20 MVA Transformer-II at 132 KV Substation Pithoragarh.

SE(O&M)/46/2015-16 06/05/2016 05/05/2016 Substation

Dismantling, re-erection and commissioning of PLCC equipments at 220 KV S/s Pantnagar for 132 KV Pantnagar – Hindustan Zinc Line.

SE(O&M)/45/2015-16 06/05/2016 05/05/2016 Substation

Revetment work of protection of tower No. 124 of 220 KV Bareilly-Pantnagar Line

CE(O&M)/01/2016-17 18/05/2016 18/05/2016 Substation

Centrifusing of Transformer oil, complete testing of 2x160 MVA transformers at 220 KV S/s Pantnagar

SE(O&M)/PTCUL/HLD/02/2016-17 27/05/2016 26/05/2016 Substation

Supply of Wire Mesh Security Fencing and Barbed Wire at 132KV Substation, Bhowali

SE(O&M)/PTCUL/HLD/03/2016-17 27/05/2016 26/05/2016 Substation

Centrifuging work of 3x5MVA T/F-II Oil and painting work of Transformer, Circuit Breaker, Junction Box etc. at 132KV Substation, Bhowali.

SE(O&M)/PTCUL/HLD/04/2016-17 27/05/2016 26/05/2016 Substation

Inter connection work between existing and newly constructed 33KV Switchyard at 220KV Substation, Pantnagar.

SE(O&M)/PTCUL/HLD/05/2016-17 27/05/2016 26/05/2016 Substation

Providing One No. Diesel Running Jeep in good show room condition of latest model along with driver of Jeep and all maintenance expenditure with availability of 24 hrs. for Assistant Engineer (O&M) PTCUL, 220KV Substation, Kamaluaganja, Haldwani for 12 months.

SE(O&M)/PTCUL/HLD/06/2016-17 20/07/2016 19/07/2016 Substation

Supply of different types of material require for stringing in remaining part of second circuit of 132KV Kamaluaganja-Kathgodam Line.

SE(O&M)/PTCUL/HLD/07/2016-17 20/07/2016 19/07/2016 Substation

Supply of line materials for inter connection between 33KV Old and New Switch Yard at 220KV Substation, Pantnagar

SE(O&M)/PTCUL/HLD/08/2016-17 20/07/2016 19/07/2016 Substation

Centrifuging of Old Transformer Oil of 80MVA T/F-I at 220KV Substation, Pantnagar.

SE(O&M)/PTCUL/HLD/09/2016-17 17/08/2016 16/08/2016 Substation

Supply & Erection of 33KV Isolator Structure at 132KV Substation, Kichha.

SE(O&M)/PTCUL/HLD/10/2016-17 17/08/2016 16/08/2016 Substation

Shifting of LILO of 132KV Khatima-Pilibhit Line at 132KV Substation, Sitarganj on newly constructed Well foundation at location No. 74 & 75 at Kailash river crossing.

SE(O&M)/PTCUL/HLD/11/2016-17 12/09/2016 09/09/2016 Substation

Supply of 33KV XLPE Cable size 3x400 Sqmm for 132KV Substation, Bhowali.

SE(O&M)/PTCUL/HLD/12/2016-17 12/09/2016 09/09/2016 Substation

Supply of 300AH, 110 Volt VRLA Battery Bank for 220KV Substation, Kamaluaganja, Haldwani.

SE(O&M)/PTCUL/HLD/13/2016-17 12/09/2016 09/09/2016 Substation

Supply of 220KV & 132KV Lightening Arrester for 220KV Substation, Kamaluaganja, Haldwani.

01/2016-17 09/09/2016 09/09/2016 Vehicle Hire

Providing One No. Diesel Running Car in good show room condition of latest model along with Fuel and driver of Car and all maintenance expenditure with availability of 24 hrs. for Chief Engineer and Nodal Officer PSDF, PTCUL, Haldwani for 03 Years.

02/2016-17 09/09/2016 09/09/2016 Vehicle Hire

Providing One No. Diesel Running Car in good show room condition of latest model along with Fuel and driver of Car and all maintenance expenditure with availability of 24 hrs. for Chief Engineer and Nodal Officer PSDF, PTCUL, Dehradun for 03 Years.

04/2016-17 10/09/2016 10/09/2016 Vehicle Hire

Providing One No. Diesel Running Car in good show room condition of latest model along with driver of Car and all maintenance expenditure with availability of 24 hrs. for Executive Engineer (Project) PTCUL, Haldwani for 12 months.

05/2016-17 10/09/2016 10/09/2016 Vehicle Hire

Providing One No. Diesel Running Car in good show room condition of latest model along with driver of Car and all maintenance expenditure with availability of 24 hrs. for Assistant Engineer (Project) PTCUL, Bageshwar for 12 months.

06/2016-17 10/09/2016 10/09/2016 Vehicle Hire

Providing One No. Diesel Running Car in good show room condition of latest model along with driver of Car and all maintenance expenditure with availability of 24 hrs. for Assistant Engineer (Project) PTCUL, Pithoragarh for 12 months.

08/2016-17 11/10/2016 11/10/2016 Vehicle Hire

Providing One No. Diesel Running Car in good show room condition of latest model along with driver of Car and all maintenance expenditure with availability of 24 hrs. for Assistant Engineer ( Project) PTCUL, Kashipur for 12 months.

SE(O&M)/PTCUL/HLD/14/2016-17 26/10/2016 25/10/2016 Substation

Supply of 132KV Bus Isolator & 33KV Bus Isolator including Structure, Terminal Connector etc. at 132KV Substation, Bhowali.

SE(O&M)/PTCUL/HLD/15/2016-17 26/10/2016 25/10/2016 Substation

Supply of 145KV Current Transformers for different Substations under 220KV O&M Division, Pantnagar.

SE(O&M)/PTCUL/HLD/16/2016-17 26/10/2016 25/10/2016 Substation

Supply of 145KV Capacitor Voltage Transformers for different Substation under 220KV O&M Division, PTCUL, Pantnagar

SE(O&M)/PTCUL/HLD/17/2016-17 26/10/2016 25/10/2016 Substation

Supply of T&P for 132KV Substation, Kathgodam and 132KV Substation, Bhowali.

SE(O&M)/PTCUL/HLD/18/2016-17 26/10/2016 25/10/2016 Substation

- Supply of Office Furniture under 220KV O&M Division, PTCUL, Haldwani at Division Office, 220KV S/s, Haldwani & 132KV S/s, Bhowali and Office Equipments at O&M Circle Office, PTCUL, Haldwani.

SE(O&M)/PTCUL/HLD/19/2016-17 26/10/2016 25/10/2016 Substation

Attending water leakage and water proofing works on the roof of SE (O&M) Haldwani office and other buildings at 220KV S/s, Kamaluaganja, Haldwani.

SE(O&M)/PTCUL/HLD/20/2016-17 26/10/2016 25/10/2016 Substation

Erection of XLPE cable, 33KV Bus Isolator for Isolating of 20MVA, 132/33KV Transformer from 2x3x5MVA Transformer Banks and Erection of 132KV Bus Isolator for making Section Isolator at 132KV Main Bus at 132KV Substation, Bhowali.

SE(O&M)/PTCUL/HLD/21/2016-17 26/10/2016 25/10/2016 Substation

Construction of wire mesh security fencing around remaining area, repairing painting of pale fencing, old wire mesh fencing and painting of external area of store room, painting of control room roof etc. at 132KV Substation, Bhowali campus.

SE(O&M)/PTCUL/HLD/22/2016-17 26/10/2016 25/10/2016 Substation

Major land development, leveling and dressing work in 220KV Switchyard at 220KV Substation, Pantnagar.

SE(O&M)/PTCUL/HLD/23/2016-17 26/10/2016 25/10/2016 Substation

Routine Horticulture works at 220KV Substation, Pantnagar.

01/EE(C)HLD/2016-17 11/11/2016 11/11/2016 Vehicle Hire

Hiring of One No. Mahindra & Mahindra Bolero/Tata Sumo Jeep Diesel Non AC (Model 2013 or after that) with trained Driver having a valid driving license for Executive Engineer, O&M Civil Division, PTCUL, 220 KV S/S Kamluwaganja, Haldwani (Nainital).

SE(O&M)/PTCUL/HLD/24/2016-17 22/11/2016 21/11/2016 Substation

132केवी0 उपकेन्द्र, काठगोदाम हेतु एल0ई0डी0 स्ट्रीट लाईट की आपूर्ति।

SE(O&M)/PTCUL/HLD/25/2016-17 22/11/2016 21/11/2016 Substation

132केवी0 उपकेन्द्र, काठगोदाम के परिसर में फैनसिंग कार्य हेतु M.S. Angle, M.S. Flat, G.I. Wire Mesh ,oa M.S. Nuts & Bolts की आपूर्ति

SE(O&M)/PTCUL/HLD/26/2016-17 22/11/2016 21/11/2016 Substation

220केवी0 परिचालन एवं अनुरक्षण खण्ड, पिटकुल, पंतनगर के अन्तर्गत 245 केवी0 व 36 केवी0 सी0टी0 की आपूर्ति।

SE(O&M)/PTCUL/HLD/27/2016-17 22/11/2016 21/11/2016 Substation

220केवी0 परिचालन एवं अनुरक्षण खण्ड, पिटकुल, पंतनगर के अन्तर्गत Capacitor Cells एवं Surge Arrestors की आपूर्ति।

SE(O&M)/PTCUL/HLD/28/2016-17 22/11/2016 21/11/2016 Substation

220केवी0 उपकेन्द्र, हल्द्वानी हेतु Armored Control Cable की आपूर्ति।

09/2016-17 20/11/2016 20/11/2016 Vehicle Hire

Providing One No. Diesel Running Car in good show room condition of latest model along with driver of Car and all maintenance expenditure with availability of 24 hrs. for Executive Engineer (Civil Project) PTCUL, Haldwani for 12 months.

SE(O&M)/PTCUL/HLD/29/2016-17 22/11/2016 21/11/2016 Substation

Renovation work of Control Room and Annexe at 132KV Substation, Bhowali

SE(O&M)/PTCUL/HLD/30/2016-17 22/11/2016 21/11/2016 Substation

Assistance of Routine Maintenance of different transmission lines in charged/shutdown conditions under 220KV O&M Division, PTCUL, Pantnagar.

SE(O&M)/PTCUL/HLD/31/2016-17 22/11/2016 21/11/2016 Substation

Miscellaneous repair works and white washing of residential colony at 132KV Substation, Kichha.

SE(O&M)/PTCUL/HLD/32/2016-17 22/11/2016 21/11/2016 Substation

Miscellaneous civil renovation work in Control room, Offices and Residential Colony at 132KV Substation, Kichha.

SE(O&M)/PTCUL/HLD/33/2016-17 22/11/2016 21/11/2016 Substation

Routine Horticulture Works at 132KV Substation, Kichha and 132KV Substation, Rudrapur

SE(O&M)/PTCUL/HLD/34/2016-17 06/12/2016 05/12/2016 Substation

Construction of CC Road from main road to control room at 132KV Substation, Bhowali.

42/2016-17 03/12/2016 03/12/2016 Substation

Providing One No. Diesel Running Jeep in good show room condition of latest model along with driver of Jeep and all maintenance expenditure with availability of 24 hrs. for Assistant Engineer (O&M) PTCUL, 132KV Substation, Kathgodam for 12 months.

SE(O&M)/PTCUL/HLD/35/2016-17 30/12/2016 29/12/2016 Substation

Supply of fabricated galvanized structure for erection work of double circuit A type tower at 132KV Kamaluaganja-Kathgodam line.

CE(O&M)/05/2016-17 30/12/2016 30/12/2016 Substation

AUGMENTATION OF T/F. CAPACITY FROM 80 MVA (2X40 MVA ) TO 100 MVA (2X40MVA + 20 MVA) AT 132/33 KV S/S RUDRAPUR

CE(O&M)/06/2016-17 30/12/2016 30/12/2016 Substation

CONSTRUCTION OF 01 NO. 132 KV TBC BAY & ASSOCIATED WORK AT 132/33 KV S/S RUDRAPUR

SE(O&M)/PTCUL/HLD/36/2016-17 24/12/2016 23/12/2016 Substation

Construction of Oil Collection Pits and Foundation Plinth of Outdoor Panel of NIFPS for 2x100 MVA & 2x40 MVA Transformers at 220KV S/s, Haldwani.

SE(O&M)/PTCUL/HLD/37/2016-17 24/12/2016 23/12/2016 Substation

Construction of Civil foundation and Oil Collection Pits for installation of Nitrojen Injection Fire Protection System in 2x160 MVA & 2x80 MVA Transformers at 220KV S/s, Pantnagar.

SE(O&M)/PTCUL/HLD/38/2016-17 19/01/2017 18/01/2017 Substation

Providing One No. Diesel Running Car in good show room condition of latest model along with driver of Car and all maintenance expenditure with availability of 24 hrs. for Chief Engineer (O&M) PTCUL, Haldwani for 12 months.

SE(O&M)/PTCUL/HLD/39/2016-17 19/01/2017 18/01/2017 Substation

Upkeeping, Monitoring and Mapping of Transmission lines under 220KV O&M Division, PTCUL, Haldwani.

SE(O&M)/PTCUL/HLD/40/2016-17 19/01/2017 18/01/2017 Substation

Upkeeping, Monitoring and Mapping of Transmission lines under O&M Division, PTCUL, Almora.

SE(O&M)/PTCUL/HLD/41/2016-17 19/01/2017 18/01/2017 Substation

Supply and Installation of 300 Mtr. Single Zone 06 Line Electronic Fencing at 220KV Substation, Kamaluaganja, Haldwani.

SE(O&M)/PTCUL/HLD/43/2016-17 31/01/2017 30/01/2017 Substation

Supply of Multipurpose water based cleaner, solvent cleaner and brushable ceramic red for insulator coating work at 132KV S/s, Kathgodam.

SE(O&M)/PTCUL/HLD/44/2016-17 31/01/2017 30/01/2017 Substation

Supply of 33KV Isolators at 220KV Substation, Haldwani.

SE(O&M)/PTCUL/HLD/45/2016-17 31/01/2017 30/01/2017 Substation

Supply of Fire fighting equipments at 132KV Substation Rudrapur & 132KV Substation, Kichha.

SE(O&M)/PTCUL/HLD/46/2016-17 31/01/2017 30/01/2017 Substation

Supply of Fire fighting equipments at 220KV Substation, Pantnagar.

SE(O&M)/PTCUL/HLD/47/2016-17 31/01/2017 30/01/2017 Substation

Supply of different type of line material for different lines under 220KV O&M Division, Pantnagar.

SE(O&M)/PTCUL/HLD/48/2016-17 31/01/2017 30/01/2017 Substation

Supply of different type of C-Type Wedge Clamps for different Substations and line under 220KV O&M Division, Pantnagar.

SE(O&M)/PTCUL/HLD/49/2016-17 31/01/2017 30/01/2017 Substation

Supply of Floodlight luminaries for different Substations and line under 220KV O&M Division, Pantnagar.

SE(O&M)/PTCUL/HLD/50/2016-17 31/01/2017 30/01/2017 Substation

Supply of Fresh Transformer Oil for different Substations under 220KV O&M Division, Pantnagar.

SE(O&M)/PTCUL/HLD/51/2016-17 31/01/2017 30/01/2017 Substation

Carrying out miscellaneous routine works for preventive maintenance of 220KV Substation, Pantnagar.

SE(O&M)/PTCUL/HLD/52/2016-17 31/01/2017 30/01/2017 Substation

Major land development, Leveling and dressing work in 132KV & 33KV Switchyards at 220KV S/s, Pantnagar.

73/2016-17 25/04/2017 25/04/2017 Substation

Providing One No. Diesel Running Car in good show room condition of latest model along with driver of Car and all maintenance expenditure with availability of 24 hrs. for Superintending Engineer Attach to Office of Chief Engineer (O&M) PTCUL, Haldwani for 12 months.

74/2016-17 25/04/2017 25/04/2017 Substation

Providing One No. Diesel Running Jeep in good show room condition of latest model along with driver of Jeep and all maintenance expenditure with availability of 24 hrs. for Assistant Engineer (O&M) PTCUL, 132KV Substation, Bhowali for 12 months. (b) Earnest Money :- Rs. 5000/-

01/2017-18 20/05/2017 15/05/2017 Pantnagar(O&M Division)

Hot Spot scanning of 132KV line complete with the help of thermovision camera as per direction of engineer in charge and providing out put report of line separately in both soft and hard copies including all labour and T&P etc. required for proper completeion of work.

SE(O&M)/PTCUL/HLD/03/2017-18 30/06/2017 01/07/2017 Executive Engineer (IT)

Revetment Work at Tower Location No. 70, 71 & 76 of 132KV Bazpur-Kamaluaganja Line.

SE(O&M)/PTCUL/HLD/04/2017-18 01/07/2017 30/06/2017 Executive Engineer (IT)

Supply of Vibration Damper for 132KV Pantnagar-Kathgodam Line.

SE(O&M)/PTCUL/HLD/05/2017-18 01/07/2017 30/06/2017 Executive Engineer (IT)

Replacement of damaged conductor between Tower No. 36 & 37, tightening of jumpers at various towers, yearly looping-chopping of tree branches and yearly grass/bushes cutting at 132KV Kathgodam-Bhowali Line.

SE(O&M)/PTCUL/HLD/06/2017-18 01/07/2017 30/06/2017 Substation

Making One No. Fire Wall between 20MVA & 3x5MVA Bank-I and Two Nos. Fire Hut at 132KV Substation, Bhowali

SE(O&M)/PTCUL/HLD/07/2017-18 01/07/2017 30/06/2017 Substation

Making Revetment Wall on Double Circuit Tower No. 32B near Village Berighat (Khatima) at 132KV Sitarganj to LILO (Khatima-Pilibhit) Line under O&M Division, PTCUL, Sitarganj.

01/EE(C)/HLD/2017-18 12/09/2017 12/09/2017 Substation

Hiring of One No. Bolero/Tata Sumo Jeep Diesel Non AC (Model 2015 or after that) with trained Driver having a valid driving license for Assistant Engineer (Civil) O&M, PTCUL, 220 KV S/S Kamluaganja, Haldwani (Nainital

SE(O&M)/PTCUL/HLD/08/2017-18 19/09/2017 18/09/2017 Substation

Erection of 01 No. Double Circuit ‘A’ type tower on already existing tower foundation then shifting all the three power conductor’s and earth wire from old single circuit tower to new double circuit tower in 132KV Kamaluaganja-Kathgodam Line.

SE(O&M)/PTCUL/HLD/09/2017-18 19/09/2017 18/09/2017 Substation

Making foundation, erection, earthing of various 132KV & 33KV LA, CVT, Wave Trap, CT, Shifting of pale fencing etc. works at 132KV Substation, Bhowali.

01/SE(C )/D.Dun/2017-18 18/11/2017 15/10/2017 Substation

Operation & Maintenance of Transit Camp Office at Divya Ratna Colony, Bhandari Farm, Chharayal, Haldwani

SE(O&M)/PTCUL/HLD/13/2017-18 15/11/2017 14/11/2017 Substation

Supply of 33KV (1250 Amp.) Isolator with Earth Switch (Metallic & Insulator) from reputed company at 220KV S/s, Kamaluaganja, Haldwani

SE(O&M)/PTCUL/HLD/14/2017-18 15/11/2017 14/11/2017 Substation

Supply of Luminaries and Smoke Detection System for Control Room Premises at 220KV S/s, Pantnagar.

SE(O&M)/PTCUL/HLD/15/2017-18 15/11/2017 14/11/2017 Substation

Supply of 33KV CT at 220KV S/s, Pantnagar

SE(O&M)/PTCUL/HLD/16/2017-18 15/11/2017 14/11/2017 Substation

Supply of various Bus and Line material at 220KV S/s, Pantnagar.

SE(O&M)/PTCUL/HLD/17/2017-18 15/11/2017 14/11/2017 Substation

Supply of different types of Control Cables at 220KV S/s, Pantnagar

SE(O&M)/PTCUL/HLD/18/2017-18 17/01/2018 16/01/2018 Substation

Providing and laying of pedestrian tiles at 132KV S/s, ELDECO, Sitarganj.

SE(O&M)/PTCUL/HLD/19/2017-18 16/01/2018 17/01/2018 Substation

Civil Renovation and White Washing of Residential Quarters Type-III, Type-II and Type-I at 132KV Substation, Sitarganj

SE(O&M)/PTCUL/HLD/23/2017-18 09/02/2018 08/02/2018 Substation

Supply and Installation of 300 Mtr. Single Zone 06 Line Electronic Fencing at 132KV Substation, Bhowali.

SE(O&M)/PTCUL/HLD/24/2017-18 09/02/2018 08/02/2018 Substation

Attending water leakage and water proofing work at roof of Control Room and other Building of 220KV Substation, Kamaluaganja, Haldwani.

SE(O&M)/PTCUL/HLD/25/2017-18 09/02/2018 08/02/2018 Substation

Construction of Open yard Store at 220KV Substation, Pantnagar.