Address :- E.E.(400 kv SS Div)
T-24/2014-15 15/04/2015 15/04/2015 Substation

Procurement of 36 KV Circuit Breaker at 220KV O&M Division,Mahuakheraganj

T-28/2014-15 15/04/2015 15/04/2015 Substation

Supply of DG sets and its accessories at 132KV Sub-station Kashipur

T-01/2015-16 27/05/2015 20/05/2015 Substation

Provision of airconditioning equipment at control room with modification of doors and windows at 132KV Sub-station Kashipur

T-02/2015-16 27/05/2015 20/05/2015 Substation

Repair/Replacement of damaged pale fencing at 132Kv Sub-station,Bazpur

T-03/2015-16 27/05/2015 20/05/2015 Substation

Grass cutting of 400/220/132Kv Switchyard at 400KV Sub-station, Kashipur

T-04/2015-16 23/06/2015 22/06/2015 Substation

Cutting of wild bushes & grass on yearly basis at division office at Pantnagar,132KV S/s Rudrapur,132KV S/s Kichha, and 132KV S/s ELDECO, Sitarganj under 220KV S/s Pantnagar

T-05/2015-16 23/06/2015 22/06/2015 Substation

Construction of boulder pitching of tower no. 9 of 132KV Kashipur-M/s IGL line near bhela river

T-06/2015-16 23/06/2015 22/06/2015 Substation

Supply of 145KV CT at 400KV Sub-station, Kashipur

T-07/2015-16 28/07/2015 27/07/2015 Substation

Turfing of 220KV switchyard at 400KV Sub-station, Kashipur

T-08/2015-16 28/07/2015 27/07/2015 Substation

Supply of 132 KV CT and 33 KV CT at 220 KV Sub-station, Pantnagar.

T-09/2015-16 28/07/2015 27/07/2015 Substation

Yearly Hot Spot Scanning of 132 KV Khatima-Piliphit and LILO Sitarganj line under 220KV O&M Division Pantnagar.

01/2015-16 28/07/2015 27/07/2015 Substation

Supply of control cable at 400KV Sub-station, Kashipur(Short Term Tender)

T-10/2015-16 28/08/2015 27/08/2015 Substation

Revetment work at tower no. 90 of 132KV Ramnagar-Kalagarh Line.

T-11/2015-16 28/08/2015 27/08/2015 Substation

Supply of control cable at 400KV Sub-station, Kashipur

T-12/2015-16 28/08/2015 27/08/2015 Substation

Painting work of various buildings of 132KV Sub-station Kichha and 132KV Sub-station Rudrapur.

T-13/2015-16 15/08/2015 15/08/2015 Vehicle Hire

Hiring of One No. Mahindra & Mahindra Bolero/Mahindra SUV Non AC diesel running jeep make with trained driver having a valid driving license for Executive Engineer 400 KV Sub-Station ,Kashipur (U.S. Nagar).

T-14/2015-16 30/09/2015 29/09/2015 Substation

Cleaning, Sweeping and washing of control room building and DG/FFPH Building and cleaning of cable trenches, drains & chilling tanks for a period of 1 year at 400KV Sub-station Kashipur

T-15/2015-16 30/09/2015 29/09/2015 Substation

Construction of fire protection wall between 40MVA T/F-1 & 80MVA T/F at 132KV Sub-station, Bazpur.

T-16/2015-16 31/10/2015 30/10/2015 Substation

Revetment work at tower no. 98 of 132KV Ramnagar-Kalagarh Line.

T-17/2015-16 31/10/2015 30/10/2015 Substation

Turfing at 33KV bays at 132KV Sub-station Bazpur

T-18/2015-16 31/10/2015 30/10/2015 Substation

Construction of watch tower at 400KV Sub-station Kashipur

T-19/2015-16 16/10/2015 16/10/2015 Vehicle Hire

Hiring of One No. Mahindra & Mahindra Bolero/Tata Sumo jeep diesel SUV make with trained driver having a valid driving license for Assistant Engineer 400 KV Sub-Station ,Kashipur (U.S. Nagar).

T-20/2015-16 30/11/2015 29/11/2015 Substation

Water proofing of roof of control room building & residential houses at 132KV Sub-station, Bazpur

T-21/2015-16 30/11/2015 29/11/2015 Substation

Grass cutting of uprooting of wild bushes in residential colony of 400KV Sub-station, Kashipur

T-22/2015-16 30/11/2015 29/11/2015 Substation

Supply of 145KV CVT at 220KV Sub-station, Mahuakheraganj

T-23/2015-16 31/12/2015 30/12/2015 Substation

Work of restringing of ACSR conductor & other miscellaneous works at 220KV Mahuakherganj-Kashipur (400) Double Ckt. Line.

T-24/2015-16 31/12/2015 30/12/2015 Substation

Supply of 132KV CTs of 800/400/200/1A at 132KV Sub-station, Bazpur

T-25/2015-16 31/12/2015 30/12/2015 Substation

Upkeeping, monitoring and mapping work for 400KV D/c Kashipur-Dhampur Line and S/c Dhampur-Moradabad Line.

T-26/2015-16 20/01/2016 19/01/2016 Substation

Work of annual maintenance of fire fighting system at 400/220/132 KV Sub-station Kashipur.

T-27/2015-16 20/01/2016 19/01/2016 Substation

Supply of 110V DC battery charger at 132KV Sub-station, Jaspur

T-28/2015-16 20/01/2016 19/01/2016 Substation

Work of one time maintenance of air cooled chillers installed at 400KV Sub-station , Kashipur

T-29/2015-16 09/02/2016 08/02/2016 Substation

Turfing at 80MVA & 40MVA T/F LV Side bays at 132KV Sub-station, Bazpur

T-30/2015-16 09/02/2016 08/02/2016 Substation

Grass cutting of 400/220/132Kv Switchyard at 400KV Sub-station, Kashipur.

T-31/2015-16 09/02/2016 08/02/2016 Substation

Supply of spares for one time maintenance of air cooled chillers installed at 400KV Sub-station , Kashipur

T-32/2015-16 16/03/2016 15/03/2016 Substation

Hot Spot Scanning of 400KV Kashipur-Dhampur Double Circuit Line and 400KV Dhampur-Moradabad .Single Circuit Line.

T-33/2015-16 16/03/2016 15/03/2016 Substation

Fabrication and fixing of missing tower parts and bolts & nuts of 400KV Kashipur-Dhampur DC line and 400Kv Dhampur-Moradabad SC line.

T-34/2015-16 16/03/2016 15/03/2016 Substation

Supply of 110V DC set, 300AH maintenance free, sealed battery cells at 132KV Sub-station, Kashipur.

T-35/2015-16 27/04/2016 26/04/2016 Substation

Patrolling and Lopping Chopping of 400KV Kashipur-Dhampur Double Circuit Line and 400KV Dhampur-Moradabad Single Circuit Line.

T-36/2015-16 27/04/2016 26/04/2016 Substation

Supply of 145KV & 36KV isolators along with structures at 132KV Substation, Bazpur.

T-37/2015-16 27/04/2016 26/04/2016 Substation

Supply of spares of 400KV, 245KV & 145KV HCB Hivelm/any other equivalent make isolators at 400KV substation, Kashipur.

01/2016-17 25/05/2016 24/05/2016 Substation

Rectification of leakage problem of 132/33KV 20MVA T/F and maintenance of its bay at 132KV Sub-station Bazpur.

02/2016-17 25/05/2016 24/05/2016 Substation

Sealing of trenches against porcupine and rodents of 400KV switchyard at 400KV Sub-station,Kashipur.

03/2016-17 25/05/2016 24/05/2016 Substation

Work of sanitary, water supply and electrical works of residential colony at 132KV Sub-station, Jaspur.

04/2016-17 23/06/2016 22/06/2016 Vehicle Hire

Hiring of 1 No. Diesel Car of Showroom Condition/Latest Model for Superintending Engineer , ETC , 400KV Sub-station, Kashipur for the period of 1 year.

05/2016-17 29/06/2016 28/06/2016 Substation

Supply & Erection of air conditioner at 132KV Sub-station Jaspur.

06/2016-17 29/06/2016 28/06/2016 Substation

Development work of lawn and other maintenance work at 132KV Substation Kashipur.

07/2016-17 29/06/2016 28/06/2016 Substation

Turfing for material stacking across chain link fencing of 400KV switchyard at 400KV Sub-station, Kashipur.

T-08/2016-17 30/07/2016 29/07/2016 Substation

Repairing work of lighting fixtures of 400/220/132KV Switchyard at 400KV Substation, Kashipur.

T-09/2016-17 30/07/2016 29/07/2016 Substation

Work of extension of air conditioning plant GI duct, air diffuser and air damper of control room building at 400KV Substation, Kashipur

T-10/2016-17 30/07/2016 29/07/2016 Substation

Supply of furniture’s and T&P at 400KV Sub-station, Kashipur

T-11/2016-17 30/07/2016 29/07/2016 Substation

Turfing of 220KV switchyard at 400KV Substation, Kashipur.

T-12/2016-17 30/07/2016 29/07/2016 Substation

Construction of record room at 400KV Substation, Kashipur.

T-13/2016-17 30/08/2016 29/08/2016 Substation

Work of grass cutting of 400/220/132KV switchyard at 400KV Sub-station,Kashipur

T-14/2016-17 30/08/2016 29/08/2016 Substation

Procurement of 245KV CT with connectors as spare for use at 220KV Sub-station, Mahuakheraganj

T-15/2016-17 30/08/2016 29/08/2016 Substation

Repair/Replacement of damaged pale fencing at 132KV Sub-station,Bazpur.

T-16/2016-17 30/08/2016 29/08/2016 Substation

Supply of vibration damper at 400KV Sub-station,Kashipur.

T-17/2016-17 30/08/2016 29/08/2016 Substation

Supply of 145KV CT at 400KV Sub-station Kashipur.

18/2016-17 05/09/2016 05/09/2016 Vehicle Hire

Hiring of Diesel Running Jeep of show room Condition along with Driver for a period of 1year for Executive Engineer 400KV Kashipur

01/2016-17 05/09/2016 05/09/2016 Vehicle Hire

Hiring of 1 No. Diesel Car of Showroom Condition/Latest Model for Superintending Engineer(PI),400KV Sub-station, Kashipur for the period of 1 year.

T-19/2016-17 30/09/2016 29/09/2016 Substation

Procurement of standard C-wedge clamps suitable for ACSR Zebra to Zebra for strengthening of 220KV Mahuakherganj-Kashipur (400) Ist Ckt. Line.

T-20/2016-17 30/09/2016 29/09/2016 Substation

Cleaning, Sweeping and washing of control room building and DG/FFPH Building and SE/EE office building for the period of 1 year at 400KV Sub-station Kashipur.

T-21/2016-17 30/09/2016 29/09/2016 Substation

Jumper strengthening work of 220KV Mahuakheraganj-Kashipur (400) Double Ckt. Line under 220KV O&M Division, Mahuakheraganj.

22/2016-17 18/10/2016 17/10/2016 Substation

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver (model not before 2015) for a period of 1year for A.E. (Lines), 400KV Sub – station, Kashipur.

23/2016-17 18/10/2016 17/10/2016 Substation

Hiring of 1 No. Van having taxi permit along with Driver (model not before 2016) for a period of 1 year on pool basis at 400KV Sub – station, Kashipur.

24/2016-17 26/10/2016 25/10/2016 Substation

Half Yearly maintenance of 400KV Kashipur-Dhampur DC line and 400KV Dhampur- Moradabad SC line.

25/2016-17 26/10/2016 25/10/2016 Substation

Turfing of 220KV switchyard at 400KV Sub- station, Kashipur.

26/2016-17 26/10/2016 25/10/2016 Substation

Provision of airconditioning equipment at control & relay room with modification of doors and windows at 132KV Sub-station,Bazpur.

27/2016-17 26/10/2016 25/10/2016 Substation

Construction of protection wall of tower in location no. 145 & 146 from nala & other two locations of 132KV Kashipur-Thakurdwara line.

28/2016-17 30/11/2016 29/11/2016 Substation

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver for a period of 1year for A.E. (Lines), 132KV Sub – station,Kashipur.

29/2016-17 30/11/2016 29/11/2016 Substation

Painting of Marshlling Box, Junction Box and miscellaneous equipments accessories and Replacement of damagedBroken rubber bidding of BMK, CT, CVT, Junction Boxes, opeating boxes of isolator, earth switch and Circuit Breaker and other miscellaneous works at 132 KV substation, Kashipur

30/2016-17 30/11/2016 29/11/2016 Substation

Development of lawn and other maintenance in residential colony at 132KV S/s Kashipur

31/2016-17 30/11/2016 29/11/2016 Substation

Maintenance of Type IV, Type-III quarters and other miscellaneous work in residential colony at 132kV Ss Kashipur

32/2016-17 30/11/2016 29/11/2016 Substation

Leakage treatment on roof of control room building and shifting of ACDB room alongwith construction of ACDB room and other miscellaneous work in control room at 132substation, Kashipur.

33/2016-17 30/11/2016 29/11/2016 Substation

Supply of 02nos. 145KV CVT at 132KV Sub-station Jaspur

34/2016-17 30/11/2016 29/11/2016 Substation

Supply of 36KV SF6 circuit breaker (CGL make) at 132KV Sub-station Jaspur.

T-35/2016-17 09/12/2016 08/12/2016 Substation

Cascading of compressors of 132Kv circuit breakers and painting of various 132KV & 33KV equipments and their structures at 132KV S/s Bazpur

T-36/2016-17 09/12/2016 08/12/2016 Substation

renovation of floor of control room/ annexxe/ guest room etc at 132kv Substation Bazpur

T-37/2016-17 09/12/2016 08/12/2016 Substation

Revetment work at location no. 32 of 132KV Kashipur (400KV) – Bazpur Line.

T-38/2016-17 09/12/2016 08/12/2016 Substation

Supply & Erection of 25KVA DG set at 132KV Sub-station, Jaspur.

T-39/2016-17 13/01/2017 12/01/2017 Substation

Work of painting 400/220/132KV switchyard wall at 400KV Substation, Kashipur

T-40/2016-17 13/01/2017 12/01/2017 Substation

Supply of control cable at 400KV Substation, Kashipur.

T-41/2016-17 13/01/2017 12/01/2017 Substation

Work of repairing of overhead tank of 400KV Substation Residential colony at 400KV Sub-station, Kashipur.

T-42/2016-17 13/01/2017 12/01/2017 Substation

Work of water leakage attending & water proofing works of control room building at 400KV Sub- Station, Kashipur.

T-43/2016-17 13/01/2017 12/01/2017 Substation

Work of monitoring of patrolling and other associated works for 400KV DC Kashipur- Dhampur line and 400Kv SC Dhampur- Moradabad line connected from 400Kv Substation, Kashipur

T-44/2016-17 13/01/2017 12/01/2017 Substation

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver for a period of 1year for A.E. (Lines), 220KV Sub – station, Mahuakheraganj

T-45/2016-17 07/02/2016 06/02/2017 Substation

Work of painting of switchyard wall and security fencing at 132KV Substation, Jaspur.

T-46/2016-17 07/02/2017 06/02/2017 Substation

Work of construction of parking shed at residential colony of 132KV Sub-station, Jaspur.

T-47/2016-17 07/02/2017 06/02/2017 Substation

Work of strengthening of jumpers and other works at LILO of 132KV Kashipur- Thakurdwara line for Mahuakheraganj under 220KV O&M Division, Mahuakheraganj.

T-48/2016-17 07/02/2017 06/02/2017 Substation

Work of development of lawn at main entrance of 132KV Sub- Station, Jaspur.

T-49/2016-17 07/02/2017 06/02/2017 Substation

Supply of 33KV CB at 220KV Sub-station, Mahuakheraganj.

T-50/2016-17 07/02/2017 06/02/2017 Substation

Supply of T&P items at 132KV Sub-Station, Jaspur

T-51/2016-17 07/02/2017 06/02/2017 Substation

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver for a period of 1year for A.E., 132KV Sub – station, Ramnagar

T-52/2016-17 29/04/2017 28/04/2017 Substation

supply of 15KVA DG set and its installation and commissioning at 132Kv Substation Ramnaga

T-53/2016-17 29/04/2017 28/04/2017 Substation

Work of land scapping and horticulture at 132 KV Substation Kashipur

T-54/2016-17 29/04/2017 28/04/2017 Substation

Work of replacement of damaged pale fencing at 132 KV.Substation Kashipur

T-06/2017-18 27/05/2017 26/05/2017 Substation

Work of arresting of 315MVA-02 Nos. & 160MVA-02 Nos. transformer oil leakage without draining of oil at 400KV Sub-station, Kashipur

T-07/2017-18 27/05/2017 26/05/2017 Substation

Work of turfing of 220KV switchyard at 400KV Sub-station, Kashipur

T-08/2017-18 27/05/2017 26/05/2017 Substation

Work of grass cutting of 400/220/132KV Switchyard at 400KV Sub-station, Kashipur

T-09/2017-18 27/05/2017 26/Month/2017 Substation

Work of monitoring of patrolling and other associated works for 220KV and 132KV line connected from 220KV Sub-station, Mahuakheraganj.

T-10/2017-18 27/05/2017 26/05/2017 Substation

Work of construction of revetment wall of location No. – 41 at 220KV Mahuakheraganj-Kashipur (400) DC line

12/2017-2018 26/06/2017 25/06/2017 Substation

Work of hot spot scanning of 400KV Kashipur-Dhampur Double circuit line and 400KV Dhampur-Moradabad single circuit line.

13/2017–18 26/06/2017 25/06/2017 220 KV O & M Division Mahua Kheraganj

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver (model not before 2015) for a period of 1year for E.E., 220KV Sub – station, Mahuakheraganj

14/2017–18 26/06/2017 25/06/2017 Substation

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver (model not before 2015) for a period of 1year for A.E. (Lines), 132KV Sub – station, Jaspur

02/EE(SCADA)/PTCUL/2017-18 13/07/2017 13/07/2017 Substation

Providing of 01 No. Diesel Running Vehicle (Mahindra Bolero or Equivalent Jeep) (02 years from the date of agreement or later model) in good condition alongwith Driver for a period of 01 year for AE (SCADA),SCADA, 400KV S/s, PTCUL, Kashipur.”

01/2017-18 25/07/2017 24/07/2017 Substation

Supply,installation & testing of 3X36ton AC plant at 400KV Substation,Kashipur.

T-15/2017-18 25/07/2017 24/07/2017 Substation

Half Yearly maintenance of 400KV Kashipur-Dhampur DC line and 400KV Dhampur Moradabad SC line.

T-16/2017-18 25/07/2017 24/07/2017 Substation

Dismantling of various old 132KV & 33KV equipments at 132KV Substation, Bazpur and 132KV Substation, Kashipur

T-17/2017-18 25/07/2017 24/07/2017 Substation

Centrifuging of old transformer oil alongwith testing of 3X40MVA transformer at 132KV Substation, Kashipur.

T-18/2017-18 27/07/2017 26/07/2017 Substation

Strengthening of 33KV main bus through replacement of single zebra through twin moose conductor with associated works at 132KV Sub-station,Bazpur.

T-19/2017-18 25/07/2017 24/07/2017 Substation

Work of repair of damaged trench and trench cover at 132KV Substation, Bazpur.

T-20/2017-18 25/07/2017 24/07/2017 Substation

Installation of AC with fall ceiling work in control room at 132KV Substation,Ramnagar.

T-21/2016-17 25/07/2017 24/07/2017 Substation

Supply of SF-6 gas for 400KV Sub-station circuit breakers at 400KV Substation,Kashipur.

T-22/2016-17 25/07/2017 24/07/2017 Substation

Supply of G.I. Flat for earthing of switchyard at 400KV Substation,Kashipur

T-23/2017-18 25/07/2017 24/07/2017 Substation

Hiring of 1 No. Diesel Car of Showroom Condition/Latest model for Superintending Engineer,ETC 400KV, Kashipur for the period of 1 year.

T-24/2017-18 25/07/2017 24/07/2017 Substation

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver (model not before 2015) for a period of1year for A.E.,132KV Sub –station, Bazpur

T-11/2017-18 14/07/2017 13/07/2017 Substation

Work of annual maintenance of fire fighting system at 400/220/132KV Sub-station,Kashipur.

T-12/2017-18 14/07/2017 13/07/2017 Substation

Work of hot spot scanning of 400KV Kashipur-Dhampur Double circuit line and 400KV Dhampur-Moradabad single circuit line.

T-13/2017-18 1/08/2017 31/07/2017 Substation

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver (model not before 2015) for a period of 1year for E.E., 220KV Sub –station,Mahuakheraganj

T-25/2017-18 23/08/2017 22/08/2017 Substation

Work of making approach road/plith for 132KV switchyard at 132KV Substation, Jaspur.

T-26/2017-18 23/08/2017 22/08/2017 Substation

Plinth for material stacking across chain link fencing of 220KV switchyard at 400KV Substation Kashipur

T-27/2017-18 06/10/2017 05/10/2017 Substation

Construction of boundary wall around staff colony at 132KV Sub-station,Bazpur.

T-28/2017-18 12/09/2017 11/09/2017 Substation

Construction of approach road at staff quarter at 132KV Substation, Bazpur

T-29/2017-18 23/08/2017 22/08/2017 Substation

Supply and Erection isolators for 33KV TBC at 132Kv Substation, Bazpur.

T-30/2017-18 05/09/2017 28/08/2017 Substation

Painting work on all equipments at 132KV Sub-station, Ramnagar

T-31/2017-18 05/09/2017 28/08/2017 Substation

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver (model not before 2015) for a period of 1year for E.E. 400KV Sub station Kashipur

T-32/2017-18 05/09/2017 28/08/2017 Substation

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver (model not before 2015) for a period of 1year for E.E. 132KV Sub station Kashipur

T-33/2017-18 29/09/2017 28/09/2017 Substation

Work of cleaning, sweeping & washing of control room building & DG/FFPH building & cleaning of cable trenches, drains & chilling tanks or the period of 01 year at 400 KV Sub-station, Kashipur.

T-34/2017-18 29/09/2017 28/09/2017 Substation

Work of making new drain wall around 315NMVA transformer & 400KV Switchyard at 400 KV Substation, Kashipur.

PTCUL/ETender/C&P-II/SS-07/2017-18 28/10/2017 28/10/2017 Substation

Supply, Erection & Testing and Commissioning of 315 MVA 400/220 KV Transformer and its associated 400KV and 220 KV Bays at 400 KV S/s Kashipur

PTCUL/ETender/C&P-II/SS-08/2017-18 28/10/2017 28/10/2017 Substation

Supply, Erection & Testing and Commissioning of 160 MVA 220/132 KV Transformer and its associated 220 KV and 132 KV Bays at 400 KV S/s Kashipur

T-36/2017-18 29/11/2017 30/11/2017 Substation

Providing of 1 No. Diesel Running Jeep having taxi permit along with Driver (model not before 2016) for a period of 1year for A.E. (Lines), 400KV Sub – station, Kashipur